homeowner to-do list
3:30 a.m., post-bath.
- connect roof vent tube to bathroom vent, reconnect fan
- back bedroom: paint walls, floors, closets; put in low cupboards on eaves closets, built in shelving above; put rods in closets proper
- stairway: runner; shelves?
- fix up basement front room for a workspace: add shelving; paint walls, ceiling, floor; put in carpeting? area rugs?; get new dehumidifier; figure out why dehumidifier keeps tripping the circuit breaker
- laundry room: add three-quarter bath; paint to brighten walls, ceiling, floor
- all basement: new window well windows to brighten
0 Comments:
Post a Comment
<< Home